Keep this running

I'm Rhett. I built this on my own so we can watch this basin's water in one place, without ads. If it is useful to you, a Ko-fi tip is optional and helps me keep the gauges running.

Support on Ko-fi →

Great Basin Pulse

Great Basin Pulse

Basin Watch List briefing

One page for a comment period or a staff folder. Each item has its own last-confirmed date. Full table and sources: https://greatbasinpulse.com/watch-list.

This is a maintained, dated, sourced public record of unresolved items in this basin's water infrastructure. It is a starting point for residents, journalists, and staff. It is not a claim that this list has moved, or will move, a vote or a hearing.

  • Lake Tahoe Dam rehabilitation study

    Study in progress · last confirmed September 2026

    Reclamation lists a rehabilitation study that opened in October 2023 as still in progress. The dam at Tahoe City dates to 1913.

    Reclamation, Lake Tahoe Dam: https://www.usbr.gov/mp/lbao/programs/lake-tahoe-dam.html

  • Truckee Canal lining

    Residual lining gap · last confirmed September 2026

    TCID describes an EIS-scale lining need of 12.7 miles. Reclamation lined 3.56 miles in Phase 1, completed May 22, 2024. Unaddressed miles remain.

    TCID, Truckee Canal Public Safety Project: https://www.tcid.org/truckee-canal-public-safety-project

  • Martis Creek Reservoir storage

    Minimum pool, no public timeline · last confirmed September 2026

    The Corps lists a 20,400 acre-foot flood pool and says the lake is held at minimum pool. Reclamation's 2023 Truckee WMOP modeled flood operations with and without Martis in service. This site found no public reactivation timeline.

    USACE, Martis Creek Lake: https://www.spk.usace.army.mil/Missions/Recreation/Martis-Creek-Lake/

  • Winter 2026-27 El Niño, local agency statements

    No statement found · last confirmed September 27, 2026

    As of September 27, 2026, no Truckee-basin water or emergency-management agency had issued a public statement on this winter's outlook. Ski operators had. An agency could speak later and this row would need a new check.

    Story, Winter 2026-27 El Niño: https://greatbasinpulse.com/#el-nino-outlook

Standing research on Tahoe Dam, the canal, and Martis: https://greatbasinpulse.com/#system-resilience. El Niño outlook: https://greatbasinpulse.com/#el-nino-outlook.

Back to the Watch List